Verti-Block from Natrix Precast is going in at Three Creeks in Clark County, WA, for Inland. Here's where the job stands.
Progress so far
- Block delivered and staged Verti-Block came straight from stock at our Vancouver yard and was staged on site, so it was ready when the crew was.
- Base course set The first course went down on a compacted base, ready for crushed stone in the hollow cores.
- Walls going up Units are set course by course with an excavator, and the interlocking connection sets each course in place.
- Backfill and compaction Backfill is going in and being compacted behind the finished courses.


Why the cores matter
Each Verti-Block has a hollow core. Crews fill the cores with crushed stone as the wall goes up, which adds weight and lets water drain down through the wall into the backfill, instead of building up behind it. Drainage details still come from the site-specific design.

More to come
We'll post more photos as the walls go up. Planning walls on a development of your own? Send us the plans for a free 3D design and take-off, or see more Verti-Block projects.



