For contractors & installers

Verti-Block for contractors and installers

We do the take-off, the preliminary design and the block. Your crew sets it. Any qualified contractor can bid and build it.

8 sq ftOf finished face per pick
No formsNo rebar, no cure time
~450 sq ftSet per crew-day, in our experience
Open specNo exclusive-installer lock-in

Why it bids well

Less time on site, less dirt to move

  • 01

    Fewer picks

    Each standard unit is 8 sq ft of finished face, set by excavator, and the connection sets the batter for you. How it goes in →

  • 02

    Less excavation

    Gravity walls reach 19 ft in good soils with no geogrid zone to dig out, and mass extenders typically backfill with native soil. Where the savings are →

  • 03

    Wins the swap

    Against a poured wall there are no forms, rebar or cure time to carry. Precast vs. cast-in-place →

What we do for your bid

You bring the crew. We handle the rest.

  • Take-offs built block by block from a 3D model of the wall
  • Free preliminary design: block counts, mass-extender layout, geogrid if it's needed, and a budget number
  • A licensed PE reviews and stamps the final design on approval
  • Block cast and stocked year-round in Vancouver, WA
  • Delivery to your site, or pickup at the yard
  • An open spec: we supply whichever contractor wins the bid
Price a job with us
Finished Verti-Block wall along a gravel lot at the Renaissance job

Bidding a Verti-Block wall

  1. 1

    Send the plans

    The wall line and section, or a grading plan and the heights. Geotech data if you have it.

  2. 2

    Get your numbers

    Block counts by type, the preliminary design and a budget number to build your bid on.

  3. 3

    Win it, schedule it

    Final design stamped on approval, and block delivered or picked up from local stock.

Before the trucks show up

What your crew needs

  • Equipment

    Excavator + block grab

    Standard units weigh about 1,760 lb; the heaviest mass extender about 5,100 lb. Every unit has cast-in lift loops.

  • Materials

    Stone, pipe, fabric

    Crushed stone for the leveling pad and the cores, perforated drain pipe and non-woven filter fabric.

  • Site

    Room to stage

    Each truckload carries 304 sq ft of wall face. Plan staging within reach of the wall line.

The full sequence, from leveling pad to finish grade: dry-stack installation guide. Take-off math: estimating and value engineering. Install specs and details: the design manual in our design library.

Long Verti-Block wall along a newly graded subdivision
Subdivision walls, set by machine.
Curving Verti-Block wall along a wet road edge below trees
Roadside walls on tight edges.
Verti-Block wall with stairs beside a gravel pad below new homes
Stairs built into the face.

Build Verti-Block walls?

Tell us about your crew.

Owners, builders and engineers ask us to recommend installers. If your crew builds Verti-Block walls, or wants to, tell us about your work and the jobs you're bidding.

Introduce your crew

FAQ

Contractor questions

Can any contractor install Verti-Block?

Yes. Any qualified contractor can install it, and there is no exclusive-installer lock-in, so the spec stays open to competitive bids. Natrix supplies whichever contractor wins the job.

What equipment does a crew need to set Verti-Block?

An excavator with a block grab, hand-operated compaction equipment for within 3 ft of the wall, and a larger compactor for the rest of the backfill. Standard units weigh about 1,760 lb and the heaviest mass extender about 5,100 lb.

Will Natrix help me bid a retaining wall job?

Yes. Send the plans and we return a block-by-block take-off from a 3D model, a free preliminary design and a budget number to build your bid on.

How much Verti-Block can a crew set in a day?

In our experience, about 450 sq ft of wall face per day. Access, staging room, curves, corners and geogrid layers all affect production.

Can I swap a poured wall for Verti-Block on a bid?

Yes, with an engineered design. We draft the preliminary design with block counts and a budget number, and a licensed PE reviews and stamps the final design for the submittal.