Natrix volumetric concrete truck

Concrete guide · Natrix Materials

Concrete delivery prices in Vancouver, WA (2026)

The real numbers: what a delivery costs by yardage and mix, what each delivery zone adds, and what is extra. Prices from the Natrix 2026 price sheet.

  • 4 min read
  • 5 sections
  • Updated

The short answer

Concrete delivered in Vancouver, WA from Natrix Materials: 1 yard of 3000 PSI is $400, and a full 10-yard truck is $2,040 (about $204 a yard). Those prices cover delivery close to our yard. Farther zones add $75 to $220 per truck. Add-ons, a $15-an-hour fuel surcharge and sales tax are extra.

Prices. These are 2026 prices from the Natrix price sheet and are subject to change. A Natrix salesperson confirms every order.

The price of a delivery depends on three things: how many yards you order, the strength of the mix, and your delivery zone (how far you are from our yard). Below is our full 2026 price list. To price your own pour, use the calculator, or download the price sheet as a PDF.

How much does concrete delivery cost per yard?

The price of a delivery is the number of yards times a per-yard rate, and the rate depends on the size of the load. Two yards of 3000 PSI is $560 ($280 a yard). A full 10-yard truck is $2,040 ($204 a yard). The table shows the price of the whole delivery by size and mix, in the first delivery zone on a weekday, with no add-ons.

Delivered price by cubic yards and mix strength (2026, zone 1, weekday, no add-ons)
Cubic yards3000 PSI3500 PSI4000 PSI4500 PSI5000 PSICDF
1$400$410$425$450$470$350
1.5$502.50$525$544.50$577.50$607.50$450
2$560$578$600$640$670$500
2.5$662.50$675$712.50$752.50$782.50$562.50
3$735$756$810$846$870$615
3.5$840$864.50$910$948.50$976.50$682.50
4$940$964$1,000$1,040$1,068$740
4.5$1,035$1,066.50$1,102.50$1,138.50$1,174.50$801
5$1,125$1,160$1,195$1,230$1,275$850
5.5$1,210$1,248.50$1,292.50$1,331$1,375$907.50
6$1,290$1,332$1,380$1,422$1,470$960
6.5$1,391$1,423.50$1,475.50$1,521$1,573$1,027
7$1,477$1,512$1,568$1,617$1,666$1,099
7.5$1,575$1,612.50$1,665$1,725$1,770$1,162.50
8$1,672$1,712$1,760$1,832$1,872$1,232
8.5$1,759.50$1,802$1,861.50$1,938$1,980.50$1,300.50
9$1,854$1,899$1,962$2,043$2,088$1,368
9.5$1,947.50$1,995$2,061.50$2,147$2,194.50$1,434.50
10$2,040$2,090$2,160$2,250$2,300$1,500

In plain terms The price per yard drops as the load gets bigger. We mix at your pour, so you can order exactly the yardage you need, from 1 yard up, with no short-load fees, and you are invoiced for what is actually placed.

PSI is the strength of the concrete, and CDF is controlled density fill. Not sure which strength your job needs? See what PSI concrete you need. Not sure how many yards? See how much concrete you need.

What does the delivery zone add?

Zones are drive time from our yard at 7319 NE 37th Ave in Vancouver. The fee is charged once per truck. A truck holds up to 10 yards, so a bigger pour goes out on more than one truck, and each truck is priced on its own load and carries its own zone fee.

ZoneDrive time from our yardDelivery feeTypical towns
Zone 10–20 minNo feeVancouver, Hazel Dell, Salmon Creek, Battle Ground (town center)
Zone 220–30 min+$75 per truckCamas, Washougal, Ridgefield, La Center, Woodland, Portland, OR
Zone 330–40 min+$145 per truckKalama, Yacolt, Gresham, OR, Oregon City, OR
Zone 440–50 min+$220 per truckKelso
Zone 550+ minCall for priceLongview, Hillsboro, OR, and farther out

The towns are typical, not exact: where you are inside a town can put you in the next zone. The calculator works out your zone from the delivery address, or from map coordinates if the lot has no address yet. We confirm every zone when we call. The delivery map shows how the zones spread out from the yard.

What do add-ons cost?

These are billed on top of the concrete. Accelerators speed up setting, hot water helps in cold weather, and fiber is added for crack control.

Add-on or chargePrice
Accelerator 1%+$12 per yard
Accelerator 2%+$24 per yard
Accelerator 3%+$36 per yard
Hot water+$8 per yard
Fiber+$15 per yard
Pea rock (4 yard minimum)+$18 per yard
Saturday delivery+$100 per truck
Fuel surcharge (on every delivery)$15 per hour of truck time: the drive out, the pour and the drive back

The fuel surcharge applies to every delivery. It is $15 for each hour of truck time, counting the drive out, your pour and the drive back, so it grows with distance and with the size of the pour. Pea rock availability can vary. Standby time is billed only if your pour runs past the time included: 8 minutes per yard, then $3 per minute.

Is sales tax included?

No. Sales tax is extra, and the rate depends on the tax area of the delivery address, which can differ from one city or county to the next. The calculator estimates the tax once you enter the address and adds it to the estimated total, and the final invoice confirms it. Card payments carry a processing fee.

How do I get an exact price?

These tables are a quick reference. The fastest exact number is the calculator: enter your pour, mix and address, and it adds the zone fee, any add-ons and the tax. A Natrix salesperson confirms every order, so you can also call (360) 852-6473 or book a delivery window on our online scheduler. For the factors behind any quote, see what affects the cost of a concrete delivery.

Download the 2026 price sheet (PDF)

Source: Natrix Materials 2026 price sheet, entered into the Natrix concrete calculator on November 2, 2026. Prices are subject to change, and a Natrix salesperson confirms every order. The calculator on the Natrix concrete page always shows the current price.

FAQ

Common questions

How much does a yard of concrete cost delivered in Vancouver, WA?

At Natrix Materials, 10 yards of 3000 PSI delivered close to our yard costs $2,040, about $204 a yard, and 1 yard costs $400. The price per yard falls as the load gets bigger. Farther delivery zones, add-ons, the fuel surcharge and sales tax are extra.

Does Natrix charge short-load fees?

No. Natrix Materials mixes at your pour, so there are no short-load fees, and you are invoiced for what is actually placed.

What does the delivery zone add to the price?

The first zone, up to 20 minutes from the Natrix yard, has no delivery fee. The next zones add $75 to $220 per truck, and the farthest zone is priced by phone.

Is sales tax included in the price?

No. Sales tax is extra and depends on the tax area of the delivery address. The Natrix calculator estimates it once you enter the address, and the final invoice confirms it.

Can I download the Natrix concrete prices?

Yes. There is a free 2-page PDF price sheet with every size and mix, the zone fees and the add-ons, on the Natrix concrete page and in this guide.