If you've only ever ordered from a drum truck, volumetric delivery can sound like a small difference. On the job it changes how much you order, what you pay for and how much you throw away.
How ready-mix works
Ready-mix concrete is batched at a plant: the cement, sand, stone and water are measured, loaded into a rotating drum and driven to your site. Once water is added, the concrete starts to set, so the load has to be placed within a set time. ASTM C94, the standard for ready-mixed concrete, generally calls for discharge within 90 minutes of adding water unless the purchaser allows more.
The load is fixed when it leaves the plant. If you over-ordered, the extra is paid for and wasted. If you under-ordered, you wait for another truck.
How volumetric works
A volumetric truck carries the dry materials and water in separate compartments and mixes them on site as it pours. It makes only as much concrete as the pour needs, and mixing stops when the pour is done. Volumetric production is covered by its own standard, ASTM C685.
That's how Natrix Materials delivers: the mix is made at your pour, there are no short-load fees, and you pay for what's placed.
Side by side
| Factor | Volumetric (Natrix Materials) | Ready-mix (drum truck) |
|---|---|---|
| Where it's mixed | At your pour | At the plant |
| Freshness | Mixed as it's placed | The clock starts before the truck leaves |
| Small pours | No short-load fees | Short-load fees are common |
| How much you order | The exact yardage, billed for what's placed | A fixed load; many order extra to be safe |
| Leftovers | Mixing stops when the pour is done | Extra concrete is paid for and often wasted |
| Scheduling | Book a delivery window online | Plant schedules and phone orders |
When volumetric fits best
- Small pours: post holes, pads, repairs and small slabs, where a drum truck's minimum load or short-load fee would cost more than the concrete.
- Uncertain yardage: flatwork with changing depths or a base you can't measure exactly. You get what the pour takes, not a guess.
- Staggered pours: several small placements on one site, poured as each is ready.
- Tight timing: jobs where you don't want a loaded drum waiting on your crew.
When a drum truck may fit
Very large single pours, or jobs already planned around a plant's schedule, can suit ready-mix. If you're not sure which fits your job, call us. We'll give you a straight answer, even if it isn't us.
Questions to ask any concrete supplier
- Is there a minimum order or a short-load fee on small pours?
- Do I pay for what's placed, or for the whole load?
- How do I book, and how is the delivery window confirmed?
- What happens if my pour runs long or the yardage changes?
Ready to book? Pick a delivery window on the concrete page, or call (360) 852-6473.
Source: ASTM C685/C685M (concrete made by volumetric batching and continuous mixing); ASTM C94/C94M (ready-mixed concrete). Natrix delivery terms as published on natrixprecast.com/concrete.