Most pour-day problems start the day before: forms that move, a soft base, a truck that can't reach the pour. Work through this list and the concrete can go straight in.
Before pour day
- Forms: set to grade, staked and braced so they won't move under the weight of wet concrete.
- Base: compacted and firm. Fill soft spots, and remove standing water and mud.
- Reinforcement: rebar or mesh in place and supported at the right height, per your plans.
- Inspection: if your job needs one before the pour, have it booked and passed.
- Yardage: worked out with a margin. See how much concrete you need or use the calculator.
- Mix: know the strength your plans call for, and tell us when you book.
Getting the truck to the pour
Plan the truck's route before it arrives. Every site is different, so tell us about access when you book:
- How far the pour is from where a truck can park
- Slopes, soft ground or a fresh driveway the truck shouldn't cross
- Overhead lines, branches and tight gates
If the truck can't reach the pour directly, plan how the concrete will get there, such as wheelbarrows or a pump, before pour day.
Crew, tools and safety
- Enough people to place and finish the concrete at the pace it's poured
- Finishing tools ready: screed, floats, edgers, groovers and wheelbarrows
- Curing compound or covers, if your plans call for them
- Gloves, eye protection and boots. Wet concrete is caustic and can burn skin, so wash it off promptly.
Weather
Check the forecast a day or two ahead. Heavy rain can damage a fresh surface, cold can slow curing and freezing can ruin it, and hot, windy weather dries the surface fast. If the forecast turns, call (360) 852-6473 as early as you can and we'll help you reschedule.
On pour day
- Walk the forms and the truck route one more time before the truck arrives.
- Have one person in charge of where the concrete goes.
- Your Natrix driver stays until the pour is placed where you want it. With volumetric delivery, the truck mixes at the pour, so if you need a little more, it keeps mixing from the materials it carries, and you pay for what's placed.
After the pour
Protect the fresh concrete from foot traffic, vehicles, rain and freezing while it cures. Follow your plans or your contractor for how long before it takes loads. Heavier loads, like vehicles, need longer than foot traffic.
Ready to book? Pick a delivery window on the concrete page, or call (360) 852-6473.
Source: General pour preparation. Your plans, engineer, inspector and local code govern the mix, thickness, reinforcement and curing for your job.